15th St Project

Rolling Plains Construction team was managed by Stacy Moser. Foreman was Jimmy Kochevar and John Johnson. We used MK-1000HB for high-rise construction and a small amount of Z-106HY. Hensel Phelps was the General Contractor and Hines the developer/owner. Everything was done with an electric Putzmeister pump and mixer. The 42-story 1144 15th Street project is the fourth tallest, occupied office building in downtown Denver. It provides approximately 708,000 SF of Class A office space on 27 floors and 477,000 SF of parking, located on two below-grade parking levels and twelve above-grade parking levels for a total of 840 parking spaces. The office building also includes a ground floor lobby with two retail spaces, a 5,500 SF fitness center with locker rooms and a 2,500 SF “living room” gathering space.